Browse documentation

Get started

Choose a deployment path

Decide between a single-host pilot and a production deployment.

For
Platform teams
Updated
September 12, 2026

Choose your installation guide

Pilot and production compared

AreaPilotProduction
HostsOne Linux host is acceptableSeparate database, control, node, and UI hosts recommended
TransportHTTP permitted for local validationTrusted HTTPS for browser-facing services
SecretsInstaller-generatedStable, unique, backed up
DatabaseLocal PostgreSQLDedicated or managed PostgreSQL with tested restore
OperationsManual checksMonitoring, alerts, retention, upgrade rehearsal

Production readiness gate

  • The packaged smoke check and an end-to-end Desktop transfer both pass.
  • Database backups are enabled and a restore has been tested.
  • Control and node environment files are stored securely.
  • Trusted HTTPS, certificate renewal, DNS, and firewall ownership are documented.
  • Operators can inspect control and node service logs.
  • The release, upgrade, and rollback procedure has been rehearsed.